Wind energy working for you
We develop, construct, and operate wind power projects — and combine them with battery storage so that more of the energy is utilized locally rather than being curtailed.
The entire value chain for wind projects
Project development
From site screening and authority approvals to grid connection.
Construction
Coordination of the entire construction process with qualified partners.
Operations & maintenance
Continuous monitoring and optimization via our VPP platform.
From idea to operation
Analysis & potential
We are mapping wind resources, grid capacity, and regulatory conditions to assess the project's technical and economic potential.
Authority Approval & EIA
We handle the EIA process, local planning, and grid connection agreements with the grid operator.
Construction
We coordinate the entire construction process with qualified partners, from foundation to grid connection.
Operations & optimization
Our VPP platform continuously monitors and optimizes production, and when combined with a battery, surplus production can be stored instead of being curtailed.
Win in numbers
Wind alone vs. wind combined with battery
Without storage, the value of surplus production on windy days is often lost.
Win alone
Wind + battery from Meganet
Good to know about wind projects
What is an EIA, and why is it necessary?
An EIA (Environmental Impact Assessment) is a mandatory environmental assessment for wind turbine projects exceeding a certain size. We manage the process as part of the official authorization.
How long does a wind project take?
From analysis to commissioning, a typical wind project takes between 2 and 5 years, primarily driven by regulatory processing, EIA, and grid connection.
Can existing wind turbines be upgraded with a battery?
Yes. We are adding battery storage to existing wind turbines, so that surplus production can be stored and sold when it is most valuable, instead of being curtailed.
Who owns the facility?
As with our other solutions, you can choose full ownership, co-ownership with Meganet, or an operating agreement where we own the facility and you receive a share of the earnings.
What happens during a downregulation?
Without storage, you lose the value of the curtailed production. With a battery in a hybrid system, the surplus production can instead be stored and used later.
Can a wind turbine participate in system services?
The wind turbine itself cannot provide system services directly, but combined with a battery, the plant can participate in FCR, aFRR, mFRR, and FFR via our VPP platform.